How the work usually goes
For a new machine, the useful conversation happens before it arrives. The nameplate, the full-load current, the phase and voltage, and whether the machine has its own transformer inside determine everything downstream: feeder size, disconnect, protection, and whether the shop has the capacity at all. A photograph of the nameplate sent by text answers most of those questions in a few minutes, and it is far cheaper than finding out after delivery.
For faults, measurement comes before replacement. Machine control electronics behave oddly when the power feeding them is not clean, and the failure looks like a machine problem until somebody checks voltage under load, phase balance, and the condition of the ground and bonding. Where a machine is faulting intermittently, testing sometimes has to happen while it is cutting, because the fault will not show up on an idle machine.
Work in a machine shop is planned around production. Machine power, lighting and distribution changes get scheduled into a window — after hours, a quiet day, or while a machine is down for service anyway. After-hours attendance is available at an additional charge, confirmed by phone. This is one electrician with service vehicles, a trailer and lift access, which fits machine power, crane and drive work, lighting and shop projects. PLC software programming is outside the scope; field wiring, controls hardware, drive setup and device work are not.
Practical note: when a machine trips on an overvoltage fault during deceleration, the drive is doing exactly what it is designed to do. The energy has to go somewhere, and that usually means a braking resistor, a longer decel time, or a drive configured for the duty. Replacing the drive without addressing that will produce the same fault on the new one.